[Audio] 24.11.2023 05.12.2023 05.12.2023 05.12.2023.
[Audio] 12.12.2023 05.12.2023 05.12.2023 05.12.2023 Kick –off Meeting with Client Overview of initial discussions, project goals, and client expectations..
[Audio] Authorization letter ( 2 days from Client side) Drawing Purchase Authorization Letter - Documentation for procuring necessary project drawings and materials.
[Audio] 24.11.2023 05.12.2023 05.12.2023 05.12.2023 Request Façade Related Drawing ( 2 days from Client side) Building Facade Drawings(Elevation , Section Drawings).
[Audio] 07.12.2023 09.12.2023 11.12.2023 21.12.2023 Engage CP( 2 Weeks from award date) Engage Professional Engineer - Introduction of the professional engineer for the project..
[Audio] Register CP at BCA ( 2 Weeks from award date) Register Professional Engineer at BCA - Ensure compliance with Building and Construction Authority regulations..
[Audio] Engage Drone vendor ( 2 Weeks from award date) Aerial Perspective - Engage Drone Vendo ,Integration of drone technology for project monitoring.
[Audio] Apply Permit at CAAS(10 days from award date) Apply Permit at CAAS Initiation of the permit application process with the Civil Aviation Authority of Singapore..
[Audio] 26.12.2023 29.12.2023 19.01.2024 09.02.2024 Approval for CAAS( 5 days from award date) Regulatory Approval - CAAS Approval Confirmation of regulatory approval for drone operations..
[Audio] Drone Inspection date Drone Inspection Date, Schedule for the initial inspection using the drone..
[Audio] Drone Inspection Report( 3 weeks from drone inspection date) Drone Inspection Report - Presentation of findings from the initial drone inspection(Building Defects)..
[Audio] Review Drone Inspection Report(3 weeks from report receive date) Evaluation - Review Drone Inspection Report Overview of the findings and necessary actions by Façade Inspector and PE.
[Audio] 16.02.2024 23.02.2024 09.03.2024 30.03.2024 PE Location Confirm(1 week after receive report from DGE) Confirmation of the professional engineer's on-site location for the close range inspection.
Close range Inspection date(1 week after receive report from PE) Scheduling a detailed, close-range inspection date for the In-depth review of the building facade undefined.
[Audio] DGE Report Preparation( 2 weeks from Close range inspection) DGE Report Preparation,Compilation of data and insights for the Detailed Ground Examination report.
[Audio] PE Review Report( 3 weeks From report submission to PE Expert Review - Professional Engineer Review, In-depth review and approval by the professional engineer..
[Audio] 28.02.2024 BCA Submission Date Submission of all required documents to the Building and Construction Authority(Drone & Close Range)..