PowerPoint Presentation

1 of
Published on Video
Go to video
Download PDF version
Download PDF version
Embed video
Share video
Ask about this video

Page 1 (0s)

[Audio] WELCOME TO ALL. WELCOME TO ALL.

Page 2 (3s)

[Audio] WELCOME TO ALL. WELCOME TO ALL.

Page 3 (3s)

[Audio] WELCOME To ALL WELCOME TO ALL WELCOME TO ALL.

Page 4 (10s)

[Audio] WELCOME ALL WELCOME TO ALL. WELCOME ALL. WELCOME TO ALL.

Page 5 (12s)

[Audio] 24.11.2023 05.12.2023 05.12.2023 05.12.2023.

Page 6 (18s)

[Audio] 12.12.2023 05.12.2023 05.12.2023 05.12.2023 Kick –off Meeting with Client Overview of initial discussions, project goals, and client expectations..

Page 7 (29s)

[Audio] Authorization letter ( 2 days from Client side) Drawing Purchase Authorization Letter - Documentation for procuring necessary project drawings and materials.

Page 8 (32s)

[Audio] 24.11.2023 05.12.2023 05.12.2023 05.12.2023 Request Façade Related Drawing ( 2 days from Client side) Building Facade Drawings(Elevation , Section Drawings).

Page 9 (43s)

[Audio] 07.12.2023 09.12.2023 11.12.2023 21.12.2023 Engage CP( 2 Weeks from award date) Engage Professional Engineer - Introduction of the professional engineer for the project..

Page 10 (46s)

[Audio] Register CP at BCA ( 2 Weeks from award date) Register Professional Engineer at BCA - Ensure compliance with Building and Construction Authority regulations..

Page 11 (49s)

[Audio] Engage Drone vendor ( 2 Weeks from award date) Aerial Perspective - Engage Drone Vendo ,Integration of drone technology for project monitoring.

Page 12 (53s)

[Audio] Apply Permit at CAAS(10 days from award date) Apply Permit at CAAS Initiation of the permit application process with the Civil Aviation Authority of Singapore..

Page 13 (56s)

[Audio] 26.12.2023 29.12.2023 19.01.2024 09.02.2024 Approval for CAAS( 5 days from award date) Regulatory Approval - CAAS Approval Confirmation of regulatory approval for drone operations..

Page 14 (59s)

[Audio] Drone Inspection date Drone Inspection Date, Schedule for the initial inspection using the drone..

Page 15 (1m 2s)

[Audio] Drone Inspection Report( 3 weeks from drone inspection date) Drone Inspection Report - Presentation of findings from the initial drone inspection(Building Defects)..

Page 16 (1m 5s)

[Audio] Review Drone Inspection Report(3 weeks from report receive date) Evaluation - Review Drone Inspection Report Overview of the findings and necessary actions by Façade Inspector and PE.

Page 17 (1m 8s)

[Audio] 16.02.2024 23.02.2024 09.03.2024 30.03.2024 PE Location Confirm(1 week after receive report from DGE) Confirmation of the professional engineer's on-site location for the close range inspection.

Page 18 (1m 11s)

Close range Inspection date(1 week after receive report from PE) Scheduling a detailed, close-range inspection date for the In-depth review of the building facade undefined.

Page 19 (1m 23s)

[Audio] DGE Report Preparation( 2 weeks from Close range inspection) DGE Report Preparation,Compilation of data and insights for the Detailed Ground Examination report.

Page 20 (1m 27s)

[Audio] PE Review Report( 3 weeks From report submission to PE Expert Review - Professional Engineer Review, In-depth review and approval by the professional engineer..

Page 21 (1m 30s)

[Audio] 28.02.2024 BCA Submission Date Submission of all required documents to the Building and Construction Authority(Drone & Close Range)..