USER D. PASSWORD. RESET. RMU Docketing System (RDS).

Scene 2 (12s)

abstract. Team Member-1 Mr Utpal Saha (Addl. Manager, System Control).

Scene 3 (35s)

RING MAIN UNITS (RMU). A Ring Main Unit (RMU) is a totally sealed, gas-insulated compact switchgear unit. The primary switching devices can either be disconnectors or circuit breakers. All the disconnectors in RMU are three position switching devices (On, Off & Earth position).

Scene 4 (1m 3s)

AUTOMATED RING MAIN UNITS (ARMU). 0 0 0. RESTORATION DURING FAULTS BY ARMU IN A TYPICAL DISTRIBUTION NETWORK.

Scene 5 (1m 31s)

AUTOMATED RING MAIN UNITS (ARMU). 35 35 0. RESTORATION DURING FAULTS BY ARMU IN A TYPICAL DISTRIBUTION NETWORK.

Scene 6 (1m 53s)

Normal remote operations from Control Room gets affected.

Scene 7 (2m 19s)

RP - Sanjiv Goenka Group Growing Legacies. AUTOMATED RING MAIN UNITS (RMU).

Scene 8 (2m 46s)

RP - Sanjiv Goenka Group Growing Legacies. PROBLEM RESOLUTION (PREVIOUS SCENARIO).

Scene 9 (3m 5s)

Difficult to track the unattended issues in ARMU due to open loop problem resolution methodology.

Scene 10 (3m 30s)

Online Portal for registering all ARMU related issues with unique docket ID & automate the process of information flow to all concerned departments.

Scene 11 (3m 55s)

RP - Sanjiv Goenka Group Growing Legacies. FINAL SOLUTION.

Scene 12 (4m 8s)

Problem identified and Necessary Docketing done. Distribution Control.

Scene 13 (4m 35s)

Mains Dept.. Motorization kit problem AB-3 Card issue Defunct FPI/VPI replacement.

Scene 14 (5m 4s)

Online portal available in CESC Intranet. läEEEi.

Scene 15 (5m 18s)

RP - Sanjiv Goenka Group Growing Legacies. RMU DOCKETNG SYSTEM.

Scene 16 (5m 28s)

adva. Closed loop methodology Dockets finally completed By DCR after proper checking & if the problem persists then again the dockets sent to concerned Departments..

Scene 17 (6m 4s)

Docket summary report with clear demarcation of responsibility Unattended issues can be tracked easily.

Scene 18 (6m 27s)

Docket with detailed problem summary Easy for the concerned departments to assess the problem & take necessary steps.

Scene 19 (6m 48s)

ARMU related Problem repository with various filter options Easy to find recurring problems in various ARMUs.

Scene 20 (7m 21s)

Pending issues related to ARMU-FRTUs can now be easily tracked & resolved due to which recurring issues get minimized.

Scene 21 (7m 50s)

RP - Sanjiv Goenka Group Growing Legacies. RMU DOCKETNG SYSTEM (ACHIEVEMENTS).

Scene 22 (8m 11s)

RP - Sanjiv Goenka Group Growing Legacies.