DISTRIBUTION CONTROL ANNUAL PERFORMANCE REPORT FY 2022-2023

1 of
Published on Video
Go to video
Download PDF version
Download PDF version
Embed video
Share video
Ask about this video

Page 1 (0s)

USER D. PASSWORD. RESET. RMU Docketing System (RDS).

Page 2 (12s)

abstract. Team Member-1 Mr Utpal Saha (Addl. Manager, System Control).

Page 3 (35s)

RING MAIN UNITS (RMU). A Ring Main Unit (RMU) is a totally sealed, gas-insulated compact switchgear unit. The primary switching devices can either be disconnectors or circuit breakers. All the disconnectors in RMU are three position switching devices (On, Off & Earth position).

Page 4 (1m 3s)

AUTOMATED RING MAIN UNITS (ARMU). 0 0 0. RESTORATION DURING FAULTS BY ARMU IN A TYPICAL DISTRIBUTION NETWORK.

Page 5 (1m 31s)

AUTOMATED RING MAIN UNITS (ARMU). 35 35 0. RESTORATION DURING FAULTS BY ARMU IN A TYPICAL DISTRIBUTION NETWORK.

Page 6 (1m 53s)

Normal remote operations from Control Room gets affected.

Page 7 (2m 19s)

RP - Sanjiv Goenka Group Growing Legacies. AUTOMATED RING MAIN UNITS (RMU).

Page 8 (2m 46s)

RP - Sanjiv Goenka Group Growing Legacies. PROBLEM RESOLUTION (PREVIOUS SCENARIO).

Page 9 (3m 5s)

Difficult to track the unattended issues in ARMU due to open loop problem resolution methodology.

Page 10 (3m 30s)

Online Portal for registering all ARMU related issues with unique docket ID & automate the process of information flow to all concerned departments.

Page 11 (3m 55s)

RP - Sanjiv Goenka Group Growing Legacies. FINAL SOLUTION.

Page 12 (4m 8s)

Problem identified and Necessary Docketing done. Distribution Control.

Page 13 (4m 35s)

Mains Dept.. Motorization kit problem AB-3 Card issue Defunct FPI/VPI replacement.

Page 14 (5m 4s)

Online portal available in CESC Intranet. läEEEi.

Page 15 (5m 18s)

RP - Sanjiv Goenka Group Growing Legacies. RMU DOCKETNG SYSTEM.

Page 16 (5m 28s)

adva. Closed loop methodology Dockets finally completed By DCR after proper checking & if the problem persists then again the dockets sent to concerned Departments..

Page 17 (6m 4s)

Docket summary report with clear demarcation of responsibility Unattended issues can be tracked easily.

Page 18 (6m 27s)

Docket with detailed problem summary Easy for the concerned departments to assess the problem & take necessary steps.

Page 19 (6m 48s)

ARMU related Problem repository with various filter options Easy to find recurring problems in various ARMUs.

Page 20 (7m 21s)

Pending issues related to ARMU-FRTUs can now be easily tracked & resolved due to which recurring issues get minimized.

Page 21 (7m 50s)

RP - Sanjiv Goenka Group Growing Legacies. RMU DOCKETNG SYSTEM (ACHIEVEMENTS).

Page 22 (8m 11s)

RP - Sanjiv Goenka Group Growing Legacies.