[Audio] Video Sop For Complete Power Failure At Cch.
[Audio] STEP-0 The operator must not panic & keep calm to avoid any mishap regarding his own safety. Operator must be in all mandatory PPEs Securing seal air is the first top-most priority in this case. The operator must immediately reach the seal air tank using portable torch lights available at site & close the inlet & outlet valves of the seal air tank in order to secure seal air available in the tank. Close the seal air valve from header. Seal air-line valve to all compressors should be closed. Shift control must be informed immediately of the situation & the nature of interruption. Shift control is in real time communication with the concerned electrical team..
[Audio] STEP-1 Close the Seal Air receiver Inlet Line valve immediately (V -1).
[Audio] STEP-2 Check the Seal Air Receiver Tank outlet valve in close position (V -2).
[Audio] STEP-3 Close the Header Seal Airline valve immediately (V -3).
[Audio] STEP-4 Check the Seal Air Interconnection line valve is in close position (V -4).
[Audio] STEP-5 Close the Inlet Seal Air Valve of all the Compressors individually.
[Audio] STEP-6 Close the Service Air Receiver Tank inlet valve immediately (V-6).
[Audio] STEP-7 Shift In-Charge will contact Electrical Shift In-charge, once Power is up for the revival of the system. Concerned electrical team gives clearance for starting equipment..
[Audio] STEP-8 Start Cooling Tower Fan as per the instruction of Electrical & Operation Shift In-charge.
[Audio] STEP-9 Start Cooling Water Pump as per instruction of Electrical & Operation Shift In-charge.
[Audio] STEP-10 Open the Seal Air Interconnection line valve (V-4).
[Audio] STEP-11 Open the Screw Compressor discharge Valve (V-4).
[Audio] STEP-12 Start the Seal Air Comp. as per instruction of Electrical & Operation Shift In-charge.
[Audio] STEP-13 Open the Seal Air Receiver Tank outlet valve (V-2).
[Audio] STEP-14 Open seal airline & start Comp. individually after checking all parameters..
[Audio] STEP-15 Start Air Dryers as per instruction of Electrical & Operation Shift In-charge.
[Audio] STEP-16 Continuous monitoring the Instrument & Mist Air Pressure Gauge.
[Audio] STEP-17 Partially open Seal air receiver Inlet Line valve Pressure reach at 6 KG/CM² (V -1).
[Audio] STEP-18 Gradually open the Service Air Receiver inlet valve after air pressure reaches at 6.5 KG/CM² (V -5).
[Audio] STEP-19 Open the Header Seal Airline and normalize the operation (V 3).
[Audio] STEP-20 After normalize the operation discuss with team & carry forward to team leader.