July 2023. Aspen East London. B24 OEE Workshop (Tues 1 Aug23).

Page 2 (26s)

[Virtual Presenter] ~1 minute Take a moment to set the rules for participation Producer to show where chat, microphone using the next few pages.

Page 3 (41s)

Agenda for today. Introduction and objectives. OEE Workshop.

Page 4 (52s)

Introduction.

Page 5 (58s)

Introduction and objectives. OEE Workshop. OEE Workshop.

Page 6 (1m 8s)

A good 100% OEE Means : You are manufacturing only good parts, as fast as possible, with no unplanned stop..

Page 7 (1m 28s)

All Time Planned Production Time Schedule Loss Run Time Availability Loss Net Run Time Performance Loss Productive Time Planned Stops Unplanned Stops Small / Minor Stops Slow Cycles Breaks Shutdown.

Page 8 (1m 40s)

Bottle with solid fill. Bottle with solid fill. Bottle with solid fill.

Page 9 (2m 14s)

abstract. What the business see’s. Why measure OEE?.

Page 10 (2m 36s)

Introduction and objectives. OEE Workshop. OEE Workshop.

Page 11 (2m 47s)

New Business. OC Tender LBB Tender. Digital Transformation.

Page 12 (3m 14s)

B23 OEE Overview. Annual Statistics (Calenda yearl 119,202,743 49,087,126 FL OFE Module 41.18% 119,202,743 49,087,126.

Page 13 (3m 32s)

B23 Monthly OEE Trend. B23 Monthly OEE% Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun 0.48656675215027106 0.45959942108606611 0.42488706865443227 0.39259449146337577 0.44724169539046477 0.46321331028487656 0.36411005925078987 0.41315569891851672 0.387439189894561 0.32928212088067654 0.38196756795044245 0.3833842491215253 B23 Average OEE% 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.41235890731366021 0.41235890731366021 0.41235890731366021 0.41235890731366021 0.41235890731366021 0.41235890731366021 0.41235890731366021 0.41235890731366021 0.41235890731366021 0.41235890731366021 0.41235890731366021 0.41235890731366021 0.41235890731366021 Target 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004 0.55000000000000004.

Page 14 (4m 20s)

Key Challenges for last year. Total Depalletizer Meeting Cleaning BoxSealler Conveyor CIP PacMats Quality Unscrambler HMI Shrinkwrap AirRinser Labeller Tooling Bulk Manning Environmentals Capper Utilities Filler Cartoner Waiting 27 30 60 128 160 210 240 320 420 430 779 826 896 945 1190 1555 1655 2690 2900 3495 5350 15557.

Page 15 (4m 51s)

B23 Releases. Actual Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun 23768015 26224820 25120850 26037637 28470311 22054609 16891651 23792250 6324484 22836550 23880323.490000308 34431838.306340329 Budget Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun 24540725 27579299 26307777 25995050 24141266 19308942 20056321 19487283 19481853 21056406 22158255 19393043.

Page 16 (5m 19s)

Introduction and objectives. OEE Workshop. OEE Workshop.

Page 17 (5m 29s)

Aspen’s operating model. What is an Operating Model?.

Page 18 (5m 51s)

L0 – Shift Handover. L1 – Shift kick off. L2 – Manager check in.

Page 19 (6m 51s)

L1 Preparation has 2 levels to it– shift handover compilation by Team Leader and handover meetings between Team Leads and Operators.

Page 20 (7m 10s)

cid image001 png 01D60E51 9C77B900. PM Leads the meeting.

Page 21 (7m 29s)

Introduction and objectives. OEE Workshop. OEE Workshop.

Page 22 (7m 39s)

General issues are addressed through formal escalation process between meeting levels.