Safety Induction Course.

Page 2 (6s)

SAFETY BRIEFING. Your safety while visiting our OSI Asia facility is very important to us. This safety induction has been established to ensure you are fully aware of the potential hazards and safety requirements during your visit..

Page 3 (21s)

EHSS POLICY. ANGE •AGE (WARNING EYE ICE RESTRICTED AREA PERSONNEL ONLY.

Page 4 (31s)

SAFETY GUIDE FOR VISITORS & GUESTS. All visitors and guests must sign in and out at the reception lobby or guard house . Safety glasses, footwear and hearing protection are mandatory in the shop floor..

Page 5 (55s)

SAFETY GUIDE FOR VISITORS & GUESTS. Watch your step and beware of continuous forklift and overhead crane operations ..

Page 6 (1m 17s)

IN CASE OF EMERGENCY. In the event of a fire emergency , the fire alarm system will be activated. Immediately proceed to the nearest safe exit by following the evacuation route as identified in the Emergency Evacuation Plan. All employees and visitors shall proceed to the designated safe area (muster point) outside the building. Your host or guide will assist you when necessary..

Page 7 (1m 55s)

EMERGENCY EVACUATION PLAN – 2 ND / 3 RD OFFICE. OPEN OFFICE REST AREA kSTAlR2 OPEN OFFICE CHANGING FIRE ESCAPE PLAN/ LOADING DIAGRAM 2.0 kWm2 Toilet 3.0 kN/m2 Offiæ/ Corridor/ Changing Room 4.0 kN/m2 Staircase 5.0 kN/m2 Lobby 7,5kN/m2 Services RECEPTION VOID s-,ÅlF LEGEND: YOU ARE HERE FIRE HOSEREEL FIRE ESCAPE ROUTE.

Page 8 (2m 12s)

EMERGENCY EVACUATION PLAN - WORKSHOP. MUSTER POINT Secu rity Office Legend: You are tMe Evacuation route Fire exit Fire First aid kit Alarm bell/button Emergency eyewash Emergency kit When you hear the fire alarm: I.) Do not panic. Stay calm. 2.) Immediately evacuate the using the nearest exit and to your designated Muster Point. 3.) not use the lift. 4.) Report to your Evacuation Leader. 5.) Stay at the Muster Point until further instructions..

Page 9 (2m 32s)

HAZARDS WITHIN THE FACILITY. Please stay clear of operations where possible. Be aware of your surroundings. Machine shop Moving parts of machine. Heavy lifting operations. Metal chips or swarf. Welding/Fabrication Moving parts of machine. Fire hazards - hot works, compressed gases. Heavy lifting operations. Slipping/tripping hazards. Noise..

Page 10 (2m 52s)

HAZARDS WITHIN THE FACILITY (CONTINUED). Test & Assembly High-pressure testing. Material movement. Overhead cranes. Heavy lift operations. Noise. Driveways Material movement. Truck movement. Forklift movement. Overhead crane operations..

Page 11 (3m 8s)

HAZARDS WITHIN THE FACILITY (CONTINUED). Blast Shop Shot blasting. Dust. Noise. Material movement. Paint Shop Spray painting. Noise. Paint fumes. Material movement..

Page 12 (3m 21s)

HAZARDS WITHIN THE FACILITY (CONTINUED). Heat Treatment Area; Respect the barricades. Follow the signages. Don’t touch any pipe without knowing. Jetty Crane operations. Moving vehicles and forklifts. Material movements. Fall into water and drowning..

Page 13 (3m 38s)

STOP WORK AUTHORITY. You are authorized to STOP or REPORT if you notice any unsafe act or unsafe condition during your visit ..

Page 14 (3m 50s)

If you have any HSE enquiries or concerns, please contact our HSE Engineer / QHSE Manager. We hope your visit to OSI (Asia) is a safe and pleasant one..

Page 15 (4m 1s)

COVID-19 MEASUREMENT. All visitor must wear the face mask at all time. Not wearing the facemask cannot accepted to enter the OSIA campus. All employees, visitor, suppliers and contractors following one-meter safe distance at all time. All visitor submit the declaration form before entre the OSIA campus. Follows latest updated regulation for covid-19 measures..