KAIZEN ACTIVITY ENGINEERING DEPARTMENT. A close up of a machine Description automatically generated with low confidence.

Page 2 (11s)

BACKGROUND STUDY. 1. During FEP preparation there were no major problem occurred. Engineering had improved the tooling and part condition before PP started..

Page 3 (45s)

KAIZEN TARGET OUTCOMES. To reduce PP part rejection.

Page 4 (1m 3s)

STUDY CASE 1. BG799 (FS-1-WL). FEP qty = 20 sets  no major part issue.

Page 5 (2m 25s)

STUDY CASE 2. PC240 (TD-02). FEP qty = 26 sets  no major part issue.

Page 6 (3m 49s)

Current practice. DEVELOPMENT FLOW. 0000 PP & MP impmwr•nt.

Page 7 (4m 53s)

PRE-PRODUCTION (PP) PART QUALITY CONTROL. Early -Middle-End part quality check.

Page 8 (5m 45s)

KAIZEN ACTIVITY OUTCOMES. 1) FS-1WL (TOP CASE) for PP.

Page 9 (6m 20s)

KAIZEN ACTIVITY EFFECT TO RMM & SUPPLIER. SUPPLIERS.

Page 10 (7m 17s)

THANK YOU! ありがとうございました!. ENGINEERING DEPARTMENT PLASTIC GROUP.