PowerPoint Presentation

Published on Slideshow
Static slideshow
Download PDF version
Download PDF version
Embed video
Share video
Ask about this video

Scene 2 (1s)

M2 Panels may be used for all parts of a building.

Scene 3 (8s)

Structures may be built without the traditional columns and beams which result in substantial cost savings.

Scene 4 (13s)

4. IMG_1214. M2 panels may also be used as internal partitions and external walls replacing CHB. It is 4x to 5x quicker to install than CHB..

Scene 5 (19s)

Polystyrene plate. Mesh of galvanized steel. 5. E lectrowelded cross connectors of  3 mm (min. 72 per m2).

Scene 6 (30s)

Single Panel Load bearing, up to 4 stories with structural plastering. Depending on d esign, traditional columns and beams are e liminated, reducing cost drastically. Used also for partition walls and curtain walls.

Scene 7 (37s)

For larger-span floors Spaces provided for integrative steel (bar joists ) and casting concrete.

Scene 8 (42s)

Polystyrene block shaped according to CAD design Coated with two layers of steel wire mesh Reinforced and finished with casting on site Easy to assemble due to its structural resistance and light weight.

Scene 9 (51s)

ADVANTAGES. SUSTAINABILITY AND ENERGY SAVING. Light.

Scene 10 (1m 12s)

REBAR INSTALLATION. INSTALLATION BEFORE CONCRETE POURING.

Scene 11 (1m 20s)

Assembly and Alignment of Panels. 04montaje1. 04montaje2.

Scene 12 (1m 23s)

With tie wire. JOINING OF PANELS.

Scene 13 (1m 26s)

DVC00038. PLUMBING & WIRING INSTALLATION. THE POLYSTYRENE IS MELTED WITH A HEAT AIR BLOWER OR SIMILAR DEVICE TO OPEN CHASES. THE MESH IS CUT OVER THE CHASES FOR INSTALLATION ,.

Scene 14 (1m 35s)

14. Plastering with hopper spray gun.

Scene 15 (1m 37s)

15. Note: If M2 panels are to be used as partitions only or as substitute for CHB, the traditional method of plastering ( hagis ) may be used..

Scene 16 (1m 44s)

16. Some Projects.

Scene 17 (1m 45s)

17. 41äJB. NHA Camarin Project.

Scene 18 (1m 47s)

18. 2 storey residential with roofdeck , Eastwood City for Megaworld.

Scene 19 (1m 49s)

Nuvoland , Libis on C5, Quezon City. peo u e p.

Scene 20 (1m 51s)

Hennan Boracay Regency.

Scene 21 (1m 53s)

Uniqlo Fisher Mall.

Scene 22 (1m 55s)

peo u e p. De La Salle Vermosa.

Scene 23 (1m 57s)

Hennan Alona Beach Boho l. 23.

Scene 24 (1m 59s)

24. Visit us at: www.m2panelsystem.com or email us at contact@m2panelsystem.com Call us at 0917-803-30-30.