Scene 1 (0s)

. . . IRRIGATION DEPARTMENT, MERGED AREAS. . KHYBER PAKHTUNKHWA.

Scene 2 (11s)

. . S.No Description. Cost. As per Revised. PC-I.

Scene 3 (35s)

. . 3. S. No. Name of Contract Package. Cost. (Rs. M).

Scene 4 (1m 21s)

. . PICTURES.

Scene 5 (1m 27s)

. . . Stone pitching at main canal both side (completed).

Scene 6 (1m 34s)

. . Stone Pitching at LBC both side (completed). .

Scene 7 (1m 42s)

. . Lining of Right Bank Canal. Before After. . .

Scene 8 (1m 50s)

. . Rehabilitation work on Left Bank Canal RD 0+00 to 0+120 m.

Scene 9 (2m 0s)

. . Silt Clearance at Left Bank Canal. Before After.

Scene 10 (2m 8s)

. . . . Left Bank Canal Before Silt Clearance.

Scene 11 (2m 16s)

. . Right Bank Canal Road Before and After Construction.

Scene 12 (2m 25s)

. . . . Water Courses Lining Concrete Work.

Scene 13 (2m 32s)

. . . . Core Cutting Test of Canal patrol Road.

Scene 14 (2m 40s)

. . THANKS.