Godrej Nest, Sec – 150 Noida. Viililiiiiiiiiiiiiiiiiiij-•,.

Page 2 (7s)

Master Plan - NEST. CLUBHOUSE PROJECT ENTRANCE GATE S/G+19+PH PROJECT ENTRANCE GATE A1 S G+i7 S G+17 S/G+29+2PH PHASE 1 p ASE S/G+19+PH B2 S/G+19+PH 83 S/G+19+PH COMMERICAL.

Page 3 (17s)

Master Plan - NURTURE. I emunN DNVUN2 narOUd Hd+6T+9/S Hd+6t+9/S ezg erg asn0Hgn1) HdZ+6Z+9/S era Hd+6T+9/S • VZV IOOd 5NllWL,NlMS •Off OMOi aoaroud LT+9 S ezv LT+9 S etV.

Page 4 (27s)

PROJECT DETAILS. Project Name Godrej Nest Location & Address Sector‐150, Noida, Uttar Pradesh Construction Technology Conventional & Aluminum Formwork Project Budgeted Cost 283 Cr BUA 1,333,347 Sqft Project Start Date May-18 Projected Completion date Jun-24 RERA Date Sep-24 Architect M/s Arcop Associates Pvt. Ltd. Structure Consultant M/s Technical Projects Consultants Pvt. Ltd. Electrical Consultant M/s Electrical Consulting Engineers HVAC Consultant M/s Dew Point Consultants Plumbing & FF Consultant M/s CP Vidya and Associates Land scaping consultant M/s Integral Design International Studio Pvt. Ltd..

Page 5 (54s)

Project Details. S.no Towers Floors Size Total units Flats PH Total 1 Tower A1 B+G+17 2 Nos‐ 3RHK – 1549 Sqft 70 0 70 2 Nos‐ 2BHK – 1262 Sqft 2 Tower A2 B+G+17 2 Nos‐ 3RHK – 1549 Sqft 70 0 70 2 Nos‐ 2BHK – 1262 Sqft 3 Tower C1 B+G+19+PH 4 Nos‐ 3BHK + Store + Utility – 2062 Sqft 76 2 78 2 Nos‐ PH 4BHK + Powder + serv – 4808 Sqft 4 Tower D1 B+G+29+PH 1 Nos‐ 3BHK + store + utility – 2330 Sqft 84 3 87 1 Nos‐ 4BHK + utility/store – 2697 Sqft 1 Nos‐ 4BHK + Family + utility/store – 3027 Sqft & PH1 – 5051 Sqft, PH2 – 5464 Sqft & PH3 – 5778 Sqft 5 Tower B2 B+G+19+PH 2 Nos‐ 3BHK + Ser. Toilet ‐ 1907 Sqft 78 2 80 2 Nos‐ 3BHK + Utility + Store – 2062 Sqft PH1 (4BHK + Fam. lounge + Ser /Utility) – 4776 Sqft & PH2 (4BHK + Fam. Lounge + Ser /Utility) – 4808 Sqft 6 Tower B1 B+G+19+PH 2 Nos‐ 3BHK + Ser. Toilet ‐ 1907 Sqft 78 2 80 2 Nos‐ 3BHK + Uti + Store – 2062 Sqft PH1 (4BHK + Fam. lounge+ Ser /Utility) – 4776 Sqft & PH2 (4BHK + Fam. Lounge + Ser /Utility) – 4808 Sqft 7 Tower B3 B+G+19+PH 2 Nos‐ 3BHK + Ser. Toilet – 1907 Sqft 78 2 80 2 Nos‐ 3BHK + Uti + Store – 2062 Sqft PH1 (4BHK + Fam. Lounge + Ser /Utility) – 4776 Sqft & PH2 (4BHK + Fam. Lounge + Ser /Utility) – 4808 Sqft Total 534 11 545.

Page 6 (1m 43s)

Godrej Nest & Nurture: Tower-wise Status. Eiii. A1 – B+G+17.

Page 7 (1m 59s)

Godrej Nest & Nurture: Tower-wise Status. B2 – B+G+19+PH.

Page 8 (2m 13s)

Godrej Nest & Nurture: Tower-wise Status. D1 – B+G+29+ 2 PH.

Page 9 (2m 27s)

Godrej Nest & Nurture: Tower-wise Status. C1a – B+G+19+ PH.

Page 10 (2m 40s)

Godrej Nest & Nurture: NTA status. Sr. No. Pour No. Priority Casting Date/Target Date Revised Date as on 16/02/2022 Actual casting date Area RCC Steel Shuttering 1 Pour-01 13-03-2021 13-03-2021 295.58 96.04 10.42 369.48 2 Pour-02 08-04-2021 08-04-2021 845.59 252.45 29.80 1056.99 3 Pour-03 29-04-2021 29-04-2021 883.47 200.42 31.14 1104.34 4 Pour-05 23-07-2021 23-07-2021 997.93 226.38 35.17 1247.41 5 Pour-04 Ist 05-09-2021 12-09-2021 425.34 96.49 14.99 531.68 6 Pour-07 500.69 113.58 17.65 625.86 7 Pour-06 2nd 05-12-2021 17-12-2021 525.45 119.20 18.52 656.81 8 Pour-09 689.26 156.36 24.29 861.57 9 Pour-20 277.15 62.87 9.77 346.43 10 Pour-08 3rd 15-01-2022 14-01-2021 567.33 128.70 19.97 706.76 11 Pour-11 4th 05-02-2022 16-02-2022 695.25 157.72 24.50 869.07 12 Pour-21 5th 26-02-2022 600.60 136.25 21.17 750.75 13 Pour-18 6th 08-03-2022 502.72 114.04 17.72 628.39 14 Pour-17 7th 07-04-2022 573.27 130.05 20.18 714.16 Pour-19 389.80 88.43 13.72 485.61 Pour-13 663.30 150.47 23.35 826.32 Pour-10 629.38 142.78 22.15 784.07 15 Pour-12 8th 17-04-2022 730.85 165.80 25.73 910.47 16 Pour-16 9th 02-05-2022 664.57 150.76 23.39 827.90 Pour-15 747.93 169.67 26.33 931.75 Pour-14 656.33 148.89 23.10 817.64 Total Qty.= 12861.77 3007.36 453.06 16053.45 Casted (Sqm) 6954.78 Balance (Sqm) 5906.99.

Page 11 (3m 47s)

Location Milestone Planned Achieved Contractual Date Delay as on 07/03/2022 Current Status / Remarks Tower- B1 Internal Plaster (Intermediate milestone) 1 0 13-Mar-22 00 07 th Floor internal plaster is in progress Tower- B2 Internal Plaster (Intermediate milestone) 1 0 06-Feb-22 30 12 th Floor internal plaster is in progress Tower- B3 Internal Plaster (Intermediate milestone) 1 0 28-Dec-21 70 17 th Floor internal plaster is in progress Tower- C1 Internal Plaster (Intermediate milestone 1 0 01-Feb-22 35 10 th Floor internal plaster is in progress Tower- D1 5 th Floor (Intermediate milestone) 0 0 22-May-21 290 02 nd Floor Slab Casted on 12-Mar-21.

Page 12 (4m 14s)

Godrej Nest & Nurture: NTA status – Pour Plan. I -hen-zo -AM-ZO -ur Od Zw- ZZ-Jdv-LT zz-qaegz n•tiæ••- zz-EN-80.

Page 13 (4m 24s)

Godrej Nest & Nurture: Extended basement ceiling works.

Page 14 (4m 49s)

Godrej Nest & Nurture: Storm & Sewer Laying. Location Grid Number Start Date End Date No of days D1 Side X1 - X5 / Y 1B / Y 29 15-05-2022 12-08-2022 90 C1 Side X 1 - X 10 / Y 1B - Y1 13-08-2022 22-08-2022 10 A1 Side X 10 - X 14 / Y 1B - Y1 23-08-2022 11-09-2022 20 A2 Side X 14 - X 19 / Y 1B - Y1 12-09-2022 01-10-2022 20 B3 Side X 18 - X 12 / Y 27 - Y 30 02-10-2022 21-10-2022 20 B2 Side X 7 - X 12 / Y 27 - Y 30 22-10-2022 10-11-2022 20 B1 Side X1 - X 7 / Y 27 - Y 29 11-11-2022 30-11-2022 20.

Page 15 (5m 17s)

Godrej Nest & Nurture: STP, UGT, HVAC works. STP Item Start Date End Date No of days Tender Package 28-02-2022 Contract Award 01-03-2022 30-05-2022 90 Structure completion & Finishes works 30-04-2022 Installation, Testing & Commissioning 31-05-2022 27-11-2022 180.

Page 16 (5m 57s)

Godrej Nest & Nurture: Clubhouse & landscape. Nest Clubhouse A Actiivites Duration Dates Start date 15-05-2022 Prelimnary activities 15 30-05-2022 GF 30 29-06-2022 1st Floor 20 19-07-2022 Terrace 20 08-08-2022 Hard Finishing + MEP 150 05-01-2023 Interiors + white goods 120 05-05-2023.

Page 17 (6m 37s)

Godrej Nest & Nurture: Milestones & COC – FY22 - AOP.

Page 18 (8m 15s)

Godrej Nest & Nurture: Milestones & COC – FY22 - AOP.

Page 19 (9m 21s)

Godrej Nest & Nurture: Critical activitites for OC application.