Mega Rural Piped Water Supply Project for Jashipur & Raruan Block Mining affected 192Nos of Villages under Mayurbhanj District

Published on
Embed video
Share video
Ask about this video

Scene 1 (0s)

[Audio] Mega Rural Piped Water Supply Project for Jashipur & Raruan Block Mining affected 192 Nos of Villages under Mayurbhanj District.

Scene 2 (20s)

[Audio] Scope of the project is to construct 14.4 M-L-D intake well to withdraw water from Khairibandhan river, treat the water at 13.7 M-L-D water treatment plant and distribute water to 48 Nos of Over head tanks to supply water to each household by tap connections. Total population of 192 villages of 20 GP will be benefited by the project.

Scene 3 (52s)

[Audio] Till now water has reached to 89 villages out of 192 villages and 77 villages are 100% saturated..

Scene 4 (1m 23s)

[Audio] 14.4 MLD CAPACITY INTAKE well is CONSTRUCTED AT village ANLABENI For water withdrawal from river for mega PWS TO jashipur BLOCK..

Scene 5 (1m 38s)

[Audio] 13.7 Mld Capacity Of Water Treatement Plant Is Constructed At Village Sanjunaposi For Water Treatment Of Mega Pws To Jashipur Block.

Scene 6 (1m 53s)

[Audio] Here are some glimps of W-T-P inside structures..

Scene 7 (2m 5s)

FILTER ANNEX BUILDING & CLARIFLOCCULATOR - 2. MEGA PWS TO JSP BLOCK-13.7 MLD WATER TREATEMENT PLANT.

Scene 8 (2m 17s)

ADMIN BUILDING & STAFF QUARTER. MEGA PWS TO JSP BLOCK-13.7 MLD WATER TREATEMENT PLANT.

Scene 9 (2m 30s)

[Audio] A lab is also constructed for water testing.

Scene 10 (2m 39s)

[Audio] The W-T-P is monitored by S-C-A-D-A system which is operated automatically..

Scene 11 (2m 53s)

[Audio] From W-T-P water reach to Over head tanks for supply to villages.

Scene 12 (3m 5s)

[Audio] Here are some of the over head tanks built for Jashipur block..

Scene 13 (3m 16s)

ELEVATED STORAGE RESERVOIR. Badsole (50 KL X 12.5 M) Completed.

Scene 14 (3m 27s)

ELEVATED STORAGE RESERVOIR. Matigarh (180 KL X 18 M) Completed.

Scene 15 (3m 36s)

[Audio] From over head tanks water is being supplied to every household by tap connections..

Scene 16 (3m 52s)

[Audio] We are conducting Har Ghar Jal meeting for every 100% saturated villages.

Scene 17 (4m 8s)

[Audio] This project facilitates to get drinking water to the people which brings joy and hope to the mining affected villages..

Scene 18 (4m 20s)

Thank You.