wbs_floating-logo. Masters Programmes Group Work Assignment Cover Sheet.

Scene 2 (1m 4s)

Operations Management. Group 15 Company selected: JLL pvt. Ltd. (Real estate consultancy) Process: Upgradation of old buildings to achieve sustainability objectives.

Scene 3 (1m 30s)

Contents. Introduction Methodology of analysis Topic selection brief 4 Vs and Operational Priorities Process Mapping Identification and analysis of Operational Challenges Recommendations.

Scene 4 (1m 49s)

ill. Introduction.

Scene 5 (1m 55s)

Icon Description automatically generated. Introduction.

Scene 6 (3m 7s)

How to take the ultimate trip. JLL aims to achieve its sustainability objectives by not only focusing on new buildings, but also by maintaining the existing buildings. Increasing energy and maintenance costs is a common problem associated with older buildings, making it imperative for landlords and investors to consider while implementing asset enhancement strategies. We selected two functions that are predominantly involved in upgrading the old buildings. Project & Development Services (Project Management team(PMT) responsible for executing the upgrades and Property Asset Management Team (PAM) responsible for maintaining them. Establishing the level of upgrade and creating a strategic plan to meet the client's objectives is a joint effort therefore both functions are being considered. The macro market considered for analysis is Mumbai (Financial Capital), India..

Scene 7 (4m 3s)

. . Upgrade the light fittings from fluorescent tubes and halogen bulbs to more efficient, longer lasting LEDs..

Scene 8 (4m 32s)

Mumbai skyline horizontal banner. Black and white silhouette of Mumbai, India. Vector template for your design. Mumbai skyline horizontal banner. Black and white silhouette of Mumbai, India. Vector template for your design. Mumbai stock vector.

Scene 9 (5m 14s)

Analysis.

Scene 10 (5m 20s)

A picture containing text Description automatically generated.

Scene 11 (6m 25s)

. Operational Priorities. Flexibility- in delivery.

Scene 12 (7m 42s)

I nitiation. Length:1 week. PEOPLE: 2 PMT (Full time); 1 PAM (Temporary); 1 SME (Temporary).

Scene 13 (9m 21s)

Maze. Challenges.

Scene 14 (9m 27s)

I nitiation. PEOPLE: 2 PMT (Full time). Issues with tasks: Management of multiple stakeholders, internal (i.e., Client’s teams) and external (i.e., consultants) High pressure and high accountability.

Scene 15 (11m 38s)

Opera tional Challenges (additional). Sequential activities – Process mapping reveals that the activities are very sequential and lack schedule optimization. The changes in regulations and guidelines can have major repercussion on the overall timelines, especially if it takes place post the design phase..

Scene 16 (12m 26s)

Urgent actions. Improve. Appropriate. Excess. Current performance.

Scene 17 (13m 17s)

Many question marks on black background. Recommendations.

Scene 18 (13m 24s)

. Recommendations. . abstract. abstract. Quality & Cost.

Scene 19 (15m 32s)

References. Armistead, C., and Machin, S. (1997), “Implications of business process management for operations management”, International Journal of Operations & Production Management , Vol. 17 No. 9, pp. 886-898. Bateman, N., and David, A. (2002), “Process improvement programmes: a model for assessing sustainability”, International Journal of Operations & Production Management , Vol. 22 No. 5, pp. 515-526. JLL research report -Futureproofing 2.0 -Upgrading commercial assets to create lasting value Dated March 2020. JLL Article -7 Ways to retrofit buildings for energy efficiency. Love, P.,E., Smith, J., Ackerman, F., Irani, Z., and Teo, P. (2018), “The costs of rework: insights from construction and opportunities for learning”, Production Planning & Control , Vol.29, No.3. Ponsignon , F., Smart, P., A., and Maull, R., S. (2011), “Service delivery system design: characteristics and contingencies”, International Journal of Operations & Production Management , Vol. 31 No. 3, pp. 324-349. Silvestro, R. (1999), “ Positioning services along the volume‐variety diagonal: The contingencies of service design, control and improvement”, International Journal of Operations & Production Management , Vol. 19 No. 4, pp. 399-421..

Scene 20 (16m 30s)

Jones Lang LaSalle Incorporated 2020 Q3 - Results - Earnings Call Presentation (NYSE:JLL) | Seeking Alpha.