SVS PROJECTS AMARAVATHI. BHASHYAM INSTITUTES Titanic Academic Building Snag Works.

Page 2 (7s)

TERRACE FLOOR.

Page 3 (15s)

Water Flowing unevenly. Pedestals Exposed and Patches.

Page 4 (22s)

RO PLANT ROOM. Wall cracks at RO Plant Room. On floor water flow and Residues.

Page 5 (30s)

EFFECTS Uneven flow of water on the surface means the surface of the slab in not levelled at the time of concreting. This leads to the seepage of water into the slab thereby up to all beams, columns and even walls too. The effect will be degrading of strength of building thereby degrades the life of building. Wall cracks has been observed in the RO plant room which caused the de-strengthening of walls..

Page 6 (37s)

TERRACE FLOOR COLUMNS & PARAPET WALL. Columns cracked and steel exposed.

Page 7 (45s)

EFFECTS Dummy columns were cracked and allowing water and air to entrain into the column resulting in corrosion of steel. This reduces the strength of column and well seepage will be progressed in to the columns. Corrosion of steel in columns leads to degrading of strength in columns and beams.

Page 8 (52s)

Typical Floors.

Page 9 (1m 0s)

WASH ROOMS. Wlliil/ r,. Washroom commodes were broken.

Page 10 (1m 8s)

OBSERVATIONS Flooring tiles were broken which leads to accumulation of debris in that area. Wall tiles were broken Plumbing from commodes was exposed onto the floor which leads to the pungent smell spreading over the area.

Page 11 (1m 15s)

CLASS ROOMS. Office Room Window pin was cracked. Floor tiles were cracked.

Page 12 (1m 23s)

OBSERVATIONS Window was pin was cracked leads to spalling of wall debris and loosening of windows from wall. Floor patches were observed as the patch grows it allows all the seepage in to the slab which leads to loosening of all tiles..

Page 13 (1m 30s)

CLASS ROOMS. Wall patches and column patches were observed.

Page 14 (1m 38s)

CLASS ROOMS. Wall cracks and wall patches were observed.

Page 15 (1m 46s)

CLASS ROOMS. Electrical holes are observed with wiring open.

Page 16 (1m 53s)

CLASS ROOMS. Wall patches were observed. Main door entry point was closed with wooden plank.

Page 17 (2m 1s)

DOORS & DOOR PINS. Academic Building Main Door. Exam Cell Entry Door.

Page 18 (2m 8s)

Stairs. Stair case beam concrete was leached and reinforcement was exposed. This leads to corrosion of steel and seepage of water..

Page 19 (2m 16s)

1.Stair case side ramp was rough and not in level. 2.Stair case below beam bottom was seepage effected. 3.Wall was cracked.

Page 20 (2m 24s)

WATER TANK. Water tank was located on the slab directly in contact. Water locate din slab is in contact wit slab leading to seepage through slab..

Page 21 (2m 31s)

WINDOWS AND GRILLS. Igg. 1.Window sill and lintel level cracks were observed. 2.Window pins were cracked..