[Audio] WELCOME IN OUR PRESENTATION, IT IS ABOUT THE INSTALLATION OF INSULATED HINGED DOOR.
Preparing the door opening:. In the PVC frame, the hole in which the door will be installed is prepared first: Opening width = door width + 7 cm Opening height = door height + 4 cm.
2. PREPARATION OF THE FLOOR. If the final ground for the site is not yet available, it is necessary to know the level of the final ground to install the frame at the correct height..
3. INSTALLATION :. Firstly : The third piece of the frame is removed, as the frame consists of three pieces, as shown in the picture *It is preferable to match the third piece to the door opening before installation to ensure that it matches the opening*.
SHOP DRAWING:. [image] tY'inoqO Qc•ir'OqO I-SH 5u,uodO.
OUR PRODUCT:. [image]. [image]. 6. [image].
[image]. [image]. [image]. 7.
[image] INSULATED DOORS INDUSTRIAL FACTORY. CONTACT US.