EHS WEEKLY REPORT. PRESTIGE TECH PACIFIC PARK, BUILDING NO 2, 10TH AND 11TH FLOOR, KADUBEESANAHALLI BANGLORE 560 103 10th OCT 2023.

Scene 2 (26s)

PROJECT BRIEF. Project Name : IG-STRIPE- BLR Location : PRESTIGE TECH PACIFIC PARK,BUILDING NO 2, 10TH AND 11TH FLOOR, KADUBEESANAHALLI, BANGLORE 560 103 Total Project Area : 1lakh 40,000 sqft Approx. Project Type : Interior Fit-out Project Handover : 20th-DEC-2023 Brief : : IG-STRIPE- BLR interiors within the specified timeframe. The project has meeting rooms, Cafeteria, Server Room & collaborative work spaces ETC..

Scene 3 (1m 14s)

[Audio] Ehs Statistics Report Project Name : MMOSER OFFICE Week No : 03 Report Number : 03 Project Start Date : 27-SEP-2023 (Pooja) SL NO description UP TO last week 1ST OCT TO 7TH OCT CURRENT week 7TH OCT TO 10TH OCT CUMMULATIVE 1 Total of No. of Employees (including Sub Contractors) 369576945 2 No of Lost Time Injuries (L T I) 0 0 0 3 Total Man-Hours Lost due to L T I NIL NIL NIL 4 No of Incidents NIL NIL NIL 5 No of First Aid Cases NIL NIL NIL 6 No of H-S-S-E Meetings at site 2 2 4 7 No of tool box meeting conducted at site 12 18 30 8 No Trainings conducted at site 3 4 7 9 Total No of Inspections conducted (with checklist) 8 28 36 10 Total No safe Man-hours Worked 4428 6912 11340 11 Total No of Induction Training 8 12 20 12 Total No of E-H-S Inductions (Attendees) 55 62117 Total No. of Days Worked 17 Days Week Commencing : From: 13-MAR-2023 TO: 17-APR-2-0-2-3.

Scene 4 (2m 39s)

[Audio] Safe Manhours Details Month Mmoser Fapa Hvac Electrical Civil &interior Network Total Oct 1248 0468 2376 7248 0 11340 Nov 0 0 0 0 0 0 0 Dec 0 0 0 0 0 0 0 1248 0468 2376 7248 0 Grand Total In Hours 11340 Oct Mmoser Fapa Hvac Electrical Interior Network 588 0 84 1488 2268 0 Nov Mmoser Fapa Hvac Electrical Interior Network 0 0 0 0 0 0 Dec Mmoser Fapa Hvac Electrical Interior Network 0 0 0 0 0 0 Mmoser Fapa Hvac Electrical Interior Network Mmoser Fapa Hvac Electrical Interior Network.

Scene 5 (3m 41s)

[Audio] Power Tool Inspection All the power tools are properly inspected before deploying for work activity Inspection tag sticker installed with validity once inspection done.

Scene 6 (3m 53s)

[Audio] Fire Extinguisher Inspection All the Fire extinguisher are properly inspected every week Inspection tag sticker installed with validity once inspection done.

Scene 7 (4m 4s)

[Audio] Temperary Db Inspection. TEMPERARY DB INSPECTION.

Scene 8 (4m 11s)

[Audio] Temperary Id Card For All Worker & Staff.

Scene 9 (4m 21s)

[Audio] Rccb Test For All Temporary Db. RCCB TEST FOR ALL TEMPORARY DB.

Scene 10 (4m 28s)

[Audio] Dg Area Barricated Barrication done at builder provided DG area. Fire bucket and extinguisher placed near DG. Deployed DG operator 24/7.

Scene 11 (4m 40s)

[Audio] Workman Welfare Organized 1. Lunch area, Drinking water, Handwash area, First aid Room etc.

Scene 12 (4m 50s)