. . . Company Profile :. E-Pilars Technologies
. . About Us. . § Started in 2016 with a small capital with diverse vision in the field of municipal.
. . Problem. • Urban India generates 62 million tonnes of waste (MSW) annually, and it has been predicted that this will reach 165 million tonnes in 2030. 43 million tonnes of municipal solid waste is collected annually, out of which 31 million is dumped in landfill sites and just 11.9 million is treated. There is not enough public bins, and the available bins are not even covered and, in many cases, waste overflows out of those bins and ends up going all over the streets. Waste transporting vehicles are not even covered in many cases which also causes littering of the streets..
. . Municipal Solid Waste Management- Scenario. , Pilars Open I.
. . . . ion • Pit Composting • Vermi-composting • Windrow Composting • MRF Facility for MSW • Processing & disposal (P&D) of Waste Inert Disposal • SLF run n-aEct Dumpsite Management Bio-mining • LTP.
. . . Kelakhera Uttarakhand India 300c 860F 2019-07-09(Tue).
. . . SOURCE SEGREGATION. . . . . .
. . . TOI. . . 1. Door to door collection 2. Source Segregation 3. Transportation.
. . . . Mission and Vision. Mission u To manage environmental solid waste as a resource and promote sustainability, eco-friendly and.
. . Products & Recovery. . Recyclables. Quality 10004_Organic.
. . . . Revenue Model. • We charge a fixed tipping fee per tonn from the respective user for collection as well as processing of waste which covers all of our cost. • We generates revenue from the sale of recyclables recovered from waste such as plastic, paper, metal etc..
. . . . YoY Growth and Financials. 2018 - Consultancy provided to modification in structural Engineering and planning of waste management for RDF plant in Gazipur waste to Energy plant having capacity 2700TPD subsidiary of IL& FS group. Total revenue generated – 35,000/- 2019 - Planning, designing, and executing Door to Door collection and processing for Aditya Birla Group's Ultratech Cement Production plant and township unit in Bilaspur Himachal Pradesh was completed successfully. Total revenue generated – 1,60,0000/- 2020 - The planning, design, execution, and Plant Installation of MSW with a daily processing capacity of 30 TPD were executed successfully for Nagar Palika Parishad Sirsaganj, Uttar Pradesh & Planning, Designing, Execution and Installation of RDF to Briquette plant having capacity of 5TPD completed successfully at NPP Sirsaganj. Total revenue generated – 10,68,4000/- 2021 – Several Upcoming projects lined-up and estimated FY 21-22 year’s revenue upto – 1,20,00,0000/-.
. . . . Team. Mr Prashant Mishra; the founder/ CEO with 12 years of experience in this industry and a graduated in BCA, Environmentalist who has also executed many waste processing projects for Aditya Birla Group, ULBs in Uttar Pradesh, NTPC and many more. Nisha Sharma, the Co-founder & Director who has 6 years of experience in this industry and is a B-Tech graduate, also has a tremendous role in developing the organization. The superior level also comprises of the Board of Directors including Mr Pranav Prassanna Sinha – Director (Engineering & Executions), An Environment Engineer and Membership from IEE having prosperous 40 years of experience in the industry, and Mr Sinha single-handedly executes several waste processing plants in India; Mayank Mishra – Director (Legal and Operations) with 7 years of experience and specialized in LLB & LLM. The Board also has comprised advisor Mr Abhishek Singh (Operation, Finance, Strategic Alliance) with 35 years of Industry experience as an Environmental Scientist..
. . Contacts:. Thank You. . 1750, Magnolia Saundaryam Street, Noida West.