Changeover Verification_End of run

1 of
Published on Video
Go to video
Download PDF version
Download PDF version
Embed video
Share video
Ask about this video

Page 1 (0s)

[Audio] Changeover Verification Date: _______________ Product: ____________ Key#_______________ Correct Shipping Labels: Yes No MUST HAVE LABELS BEFORE JOB RUNS Does this Job Key Require a QCP: YES NO (QCP MUST be posted at the printer in designated location with SIGNED Authorization form) IS sample present on press: Yes No Sample pot most be verified by Operator who completed the Change Over and by someone that is one layer higher, this requires both to sign the Sample Pot and date it. (DO NOT RUN WITHOUT SAMPLE) Operator/Packer: _____________ Tech/Supervisor: _______________ MUST BE SIGNED BY TECH AND OPERATOR BEFORE JOB STARTS TO BE PACKED Printer Pre-Flight Check List 1: previous job removed from press: ____________ 2: correct colors for new job on press: ___________ 3: drip pans installed:_______ 4: rollers locked in: ___________ 5: blankets installed correctly: __________ Operator / packer: __________________________ End of Run Check List Must be completed before job is taken off of printer 1: Correct count of pink tags for job: _______________ 2: Is there any left-over skid labels? Yes No 3: Remove Sample Pot: Yes No If YES you MUST notify your supervisor. Extra labels need to be turned in with the schedule. Operator/Packer:________________________Tech/Supervisor:_________________________.