PowerPoint Presentation

1 of
Published on Video
Go to video
Download PDF version
Download PDF version
Embed video
Share video
Ask about this video

Page 1 (0s)

7393e6d2fc74159836bb16d23f5ad70b. KAIZEN PROJECTS.

Page 2 (6s)

CONTENTS. TS. CN. YF. PPS. SG.

Page 3 (14s)

SECTION. TS.

Page 4 (19s)

01. CT5922 Kaizen Change of Pin Assembly Sequence.

Page 5 (27s)

1. CT5922 Kaizen Change of Pin Assembly Sequence.

Page 6 (45s)

02. CONTACT INSPECTION MACHINE.

Page 7 (52s)

2. CONTACT INSPECTION MACHINE. ENCOUNTERED PROBLEM.

Page 8 (1m 9s)

03. NP568-078-016P-1 ME INSERTION MACHINE.

Page 9 (1m 16s)

3. NP568-078-016P-1 ME INSERTION MACHINE. abstract.

Page 10 (1m 33s)

3. AFTER CONDITION. NP568-078-016P-1 ME INSERTION MACHINE.

Page 11 (1m 48s)

04. NP568-078-016P-1 #CV & #LO Assembly Machine.

Page 12 (1m 57s)

4. NP568-078-016P-1 #CV & #LO Assembly Machine. White-person Clip Art at Clker.com - vector clip art online, royalty free & public domain.

Page 13 (2m 16s)

4. NP568-078-016P-1 #CV & #LO Assembly Machine. AFTER CONDITION.

Page 14 (2m 33s)

05. NP568-078-016P-1 #IN-A Assembly Machine.

Page 15 (2m 41s)

5. NP568-078-016P-1 #IN-A Assembly Machine. BEFORE CONDITION.

Page 16 (3m 0s)

SECTION. YF.

Page 17 (3m 5s)

06. Semi-automatic clean roller machine.

Page 18 (3m 14s)

Manual roller cleaning of flex (back to back) prior stiffener / adhesive attachment..

Page 19 (3m 29s)

07. FI-SE20ME adapter attachment machine improvement.

Page 20 (3m 38s)

abstract. BEFORE CONDITION. Setup Time: 15 mins AAT: 24 sec NG Rate: 5/1000 (0.5%) P.O. : 20,000.

Page 21 (3m 55s)

08. Internal development of dual-nozzle air blow machine.

Page 22 (4m 3s)

abstract. abstract. Enter Text Enter Text Manual air blow functionality by the use of pneumatic foot pedal with 1 nozzle Single purpose air blow machine targeting for unit application Requirement of multipurpose air blow machine due to YF transfer.

Page 23 (4m 20s)

09. Development of semi-automatic adapter attachment machine (NRS).

Page 24 (4m 29s)

Manual operation of adapter attachment jigs for that requires 2 manpower to process continuously.

Page 25 (4m 44s)

10. Process migration from manual to camera alignment for adapter attachment.

Page 26 (4m 53s)

Adapter Type Manual Camera Remarks 31 Pins 2 4 Complete 41 Pins 2 2 Incomplete 51 Pins 2 2 Incomplete 80 Pins 0 2 Small P.O. FFC 0 2 Small P.O..

Page 27 (5m 8s)

11. Silk Printing Machine Improvement.

Page 28 (5m 17s)

11. Silk Printing Machine Improvement. Vacuum ON.

Page 29 (5m 33s)

SECTION. CN.

Page 30 (5m 38s)

12. HF111-106P Caulking Die -Stripper Plate Modification.

Page 31 (5m 46s)

12. HF111-106P Caulking Die -Stripper Plate Modification.

Page 32 (6m 5s)

13. Elimination of CT Distortion and Stuck at CT5188 Bending and Cutting Machine.

Page 33 (6m 13s)

13. Elimination of CT Distortion and Stuck at CT5188 Bending and Cutting Machine.

Page 34 (6m 30s)

14. Elimination of Damaged #MO defect on HF106P-6012 product.

Page 35 (6m 38s)

14. Elimination of Damaged #MO defect on HF106P-6012 product.

Page 36 (6m 55s)

14. Elimination of Damaged #MO defect on HF106P-6012 product.

Page 37 (7m 10s)

15. Manpower Reduction for FPS009-2913 Line.

Page 38 (7m 19s)

15. Manpower Reduction for FPS009-2913 Line. BEFORE CONDITION.

Page 39 (7m 37s)

15. Manpower Reduction for FPS009-2913 Line. AFTER CONDITION.

Page 40 (7m 54s)

16. Internal Fabrication modification of Pressing machines (Pneumatic cylinder to Servo motor actuator).

Page 41 (8m 3s)

16. Internal Fabrication modification of Pressing machines (Pneumatic cylinder to Servo motor actuator).

Page 42 (8m 22s)

SECTION. PPS.

Page 43 (8m 27s)

17. NP568-078-016#IN-B No. 3 Automatic Segregation.

Page 44 (8m 35s)

17. NP568-078-016#IN-B No. 3 Automatic Segregation.

Page 45 (8m 53s)

18. HF507-31-02 # MO Spool bush improvement.

Page 46 (9m 0s)

18. HF507-31-02 # MO Spool bush improvement. BEFORE CONDITION.

Page 47 (9m 17s)

19. Replacement of Worn-out Injection Machine Plunger Assembly and Plunger Packing.

Page 48 (9m 26s)

19. Replacement of Worn-out Injection Machine Plunger Assembly and Plunger Packing.

Page 49 (9m 43s)

19. Replacement of Worn-out Injection Machine Plunger Assembly and Plunger Packing.

Page 50 (9m 58s)

20. AUTOMATIC SEGREGATION for CN109S-022#IN.